USD/NPR152.59EUR/NPR177.00+0.02%Gold (tola)Rs 3,01,000-0.40%PetrolRs 200
Nepal Everyday
Nepal Everyday

Road closure · live

CLOSED — Rani-Biratnagar-Itahari-Dharan-Dhankuta-Hile, Leguwaghat-Tumlingtar-Khandbari-Num-Kimathanka (Koshi Rajmarg)

Live detail from official feeds — auto-updated on every view, with safety guidance and helplines.

All disaster updates

Key facts

TypeRoad closure
Date2026-09-05
StatusCLOSED
RefNH08
LocationMakalu-3, Sankhuwasabha
CauseLandslide
Repair ETA2 days

What happened

Rani-Biratnagar-Itahari-Dharan-Dhankuta-Hile, Leguwaghat-Tumlingtar-Khandbari-Num-Kimathanka (Koshi Rajmarg) (NH08) is currently fully closed at Makalu-3, Sankhuwasabha since 5 Sept 2026. Reported cause: Landslide

This stretch has been continuously blocked for 9 days, since 5 Sept 2026.

This is a recurring closure: blocked 3 of the last 7 days, so expect repeat disruption on this stretch even after it reopens.

The Koshi Rajmarg (NH08), specifically the stretch connecting Rani-Biratnagar-Itahari-Dharan-Dhankuta-Hile to Leguwaghat-Tumlingtar-Khandbari-Num-Kimathanka, has been closed to traffic since September 5, 2026.

The closure was caused by a landslide that has obstructed the highway.

Sources: OnlineKhabar

In the news

  1. 1.Bhotekoshi floods: Damage to 18 schools; Rs 4.23 billion estimated for recovery OnlineKhabar
  2. 2.Roads damaged by the Bhotekoshi flood are currently undergoing reconstruction efforts. myRepublica · 6 Sept 2026

Press coverage refreshed daily · updated 13 Sept 2026 — full story at the source.

Staying safe

Relief & help

Official sources

BIPAD live mapRescue portal

Detail lives with its publisher (linked above) — this page refreshes from official feeds on every view.